Electricity

Cogeneration (CHP)

imagen_1

In order to enhance energy efficiency at its refineries and production sites, CEPSA has five cogeneration (also known as combined heat and power or CHP) facilities to simultaneously produce electricity and steam. The annual average use of these facilities reaches more than 80%. In order to meet new steam consumption needs at CEPSA’s facilities, two new cogeneration plants are in the process of being built, one unit at the "La Rábida" Refinery, and another plant at ASESA (Asphalt refinery, 50% CEPSA).

Nueva Generadora del Sur

imagen_2

NGS, a 50/50 venture between CEPSA and Unión Fenosa, operates a natural gas-fired combined cycle power plant located on property belonging to the "Gibraltar-San Roque" Refinery. This plant sells all of its steam production to the Gibraltar-San Roque Refinery, and from an environmental standpoint, contributes towards sharply reducing CEPSA’s nitrous oxide (NOx) and sulfur dioxide (SO2) emissions.


Society Authorized power (MW)
GEPESA (70% CEPSA).
  • Cogeneration "La Rábida"
  • Cogeneration GEGSA
  • Cogeneration GETESA
  • Cogeneration GEMASA
50
74
41
27
COTESA (100% CEPSA) 38
Total Cogeneration 230
Nueva Generadora del Sur (50% CEPSA) 780

For more information about CEPSA´s activities related to electricity, consult the Annual Report.